After-sales Service: | Support |
---|---|
Warranty: | Crypto Mining Container |
Usage: | Storage,Workshop,Construction,Dormitary,Office |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Container homes is a standard mobile house. Solid structure makes this house resist up to 120KM/H wind speed. Flat packing and loading into 40 foot containers when shipping makes goods safe and easy to transport and lay in at local site. With the character of free moving and fast installation, Modular house is highly favorite by construction companies, mining companies, road & bridge companies all over the world.
Electrical Element
|
No. | Product Name |
Specificcations andmodels |
|
1 |
|
630A/4p |
3 |
|
2 |
miniature air switch |
100A/3P |
21 |
|
|
|
36A/3P |
4 |
|
3 |
PDU custom socket for PDU mining box |
16A/12 16A/12holes |
21 |
|
4 |
electric wire |
JVR5*16 |
220m |
|
5 | distribution box |
ammeter, mutual inductor, lightning-protection, surge. |
1200KW/Current carrying |
|
6 |
copper bar |
(25G),(4KG) |
||
Network part |
7 |
|
24 24 connectors |
12 |
8 |
finished more than five types of network cable |
3 3 meters |
265 |
|
The unit frame |
9 |
Storage rack |
2.55, 5.75m, 42cm |
|
Cooling measure |
10 |
Water curtain wall |
1.8 m, 2.3m,15 cm |
3 |
11 |
Negative pressure fan |
1*1 |
8 |
|
Mining box body |
The mining box body adopts hot rolled steel, cold rolled steel, channel steel and thickened square steel tube for seamless welding, which can bear 45tons. |
Sizes:
|
||||
Dimension/mm
|
Length
|
5950
|
||
Width
|
2250/2450
|
|||
Height
|
2600
|
Material:
|
||
Frame
|
Galvainzed steel frame
|
|
Floor
|
15mm plywood
|
|
Wall
|
Galvainzed steel+EPS Insulation board
|
|
Roof
|
Galvainzed steel+EPS Insulation board
|
|
Window
|
Aluminium alloy window with double glass
|
|
Door
|
Aluminium alloy door
|
1.Low cost and easy to shipping (Save freight);
2.Light steel structure (reliable frame);
3.Flexible layout and design;
4.Easy and quick assemble and no need special trained labors;
5.Extensive and flexible application.
1.Q: How to buy?
A: You can provide us your drawing, and we will produce as your drawings or we help you design according to your requirement.
2.Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
3.Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
4.Q: How to ship?
A: Loading by sea shipping container.
5.Q: How to install after the goods arriving destination?
A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be borne by buyers.
Suppliers with verified business licenses